| Kuwait Oil Company |
PETROFAC INTERNATIONAL LTD. |
40" Gas Pipeline : Construction of 40" Gas Pipeline from BS-131 to LPG Plant at Mina Abdullah.
The project management covering civil and earth works, fabrication, construction, installation, mechanical completion, pre-commissioning completion, and commissioning assistance. |
2009 |
2010 |
Equate Petrochemical Company
Kuwait |
EQUATE |
Polyethylene Plant :
Construction of all Mechanical, Electrical, Instrumentation and Steel Structures |
2008 |
2009 |
| Kuwait Oil Company |
SNAMPROGETTI S.P.A. |
Booster Station (BS - 160) : Construction of Civil, Buildings, Mechanical, Structural, Electrical and Instrumentation works including Pre-commissioning and commissioning assistance. |
2008 |
2011 |
Joint Operations
(Kuwait Gulf Oil Co. / Saudi Arabian Chevron Inc.)
Kuwait |
JO |
Design, Engineering, Procurement, Construction, Pre-commissioning and Commissioning of Large Scale Pilot Steam Flood Facility. |
2007 |
2009 |
Petrochemical Industries Company - PIC
Kuwait |
TECNIMONT S.P.A |
Aromatic Complex : Construction of all Civil, Building Works, Structural Steel Erection, Erection / Installation of Mechanical and Electrical Works, Instrumentation, Precommissioning, and Commissioning assistance |
2006 |
2009 |
| Kuwait Oil Company |
PETROFAC INTERNATIONAL LTD. |
Facility upgrade and relocation of Under Ground Process Piping (Group A):
Construction of all Civil, Mechanical, Electrical and Instrumentation works and commissioning assistance |
2005 |
2009 |
| The Kuwait Olefins Company |
FOSTER WHEELER |
Construction Electro-mechanical works of Ethylene Glycol Plant - II
Installation and commissioning of heavy and medium weight steel structures and equipment such as columns and towers, reactors, vessels, heat exchangers, pumps, motors and transformers and various types of steel and Fiber Reinforced Plastic (FRP) pipes. Scope of work includes the engineering, procurement and construction of a two storey substation building along with all related HVAC, electrical and fire alarm works |
2006 |
2008 |
Joint Operations
(Kuwait Gulf Oil Co. / Saudi Arabian Chevron Inc.)
Kuwait |
JO |
Steam Flood Facilities; Procurement, construction of Facilities includes Civil, Piping, Electrical and Instrumentation works |
2005 |
2005 |
| Kuwait Oil Company |
PETROFAC INTERNATIONAL LTD. |
Construction, Testing, Pre-commissioning and Commissioning Assistance for North Kuwait Crude Oil Export Systems |
2004 |
2006 |
| Kuwait Oil Company |
SK ENGINEERING & CONSTRUCTION CO. |
Construction, Rebuilding and Upgrading of Booster Station (BS - 130) |
2003 |
2005 |
| Kuwait Oil Company |
DAELIM |
Construction of Effluent Water Injection Plant & Pipeline, South East Kuwait |
2003 |
2006 |
Kellogg Brown & Root - KBR
Iraq |
KELLOGG BROWN & ROOT |
Oil Field Assessment & Repair Works:
• Providing logistical support including Manpower,
Equipment & Material
• Site preparation and finishing
• Site survey of North & South Rumaila NGL Plant
• Various Civil works at NGL Plant
• Install and hook up water and sewerage lines
• Repair and install new chain link fence
• Supply & fabricate fuel gas flare gas piping
• Fabricate & erect the CS pipe spools
• Accommodation units, Camps
• Repair the main 48" Export Pipeline and Valves
• QC / NDE Services |
2003 |
2004 |
Kellogg Brown & Root - KBR
Iraq |
KELLOGG BROWN & ROOT |
Support Services for Kellogg Brown & Root :
Support of Fire Fighting Operations, Supply of qualified Manpower and Supply of Construction Equipment with its operation. |
2003 |
2004 |
| Kuwait National Petroleum Company - KNPC |
SK ENGINEERING & CONSTRUCTION CO. |
Demolition Works for fire-damaged facilities at Mina Al Ahmadi Refinery
Disassembling all the equipment and salvaging all types of structures, pipes and buildings within the limited time frame and area. Removal of Structural steel, Demolition of Equipment / Drums, Towers, Demolition of Tanks, Demolition / Removal of Concrete Foundations |
2001 |
2002 |
Petrochemical Industries Company - PIC
Kuwait |
PIC |
Revamping of Ammonia Line - II |
2001 |
2002 |
| Kuwait Oil Company |
PETROFAC INTERNATIONAL LTD. |
Upgrading of Gathering Centre (GC - 23) |
2001 |
2002 |
| Kuwait National Petroleum Company - KNPC |
ABB LUMMUS HEAT TRANSFER B.V. |
Construction of Crude Heater for MAA Refinery CDU # 3 |
2001 |
2001 |
| Kuwait Oil Company |
SNAMPROGETTI S.P.A. |
Construction of Lift Gas Distribution System for Sabriyah & Raudhatain Oil Fields |
2001 |
2003 |
| Qatar Liquefied Natural Gas Company - QATAR GAS |
TECHNIP |
Construction of Sulfur Recovery Expansion Plant
(Joint Venture with M/s MECON) |
2000 |
2002 |
| Kuwait National Petroleum Company - KNPC |
KNPC |
Construction of Flare Gas Recovery Unit at Shuaiba Refinery |
2000 |
2001 |
| Kuwait Oil Company |
KOC |
Replacement of Crude Oil Pipelines from 18" Dia to 20" Diameter |
2000 |
2001 |
| Kuwait National Petroleum Company - KNPC |
M.A. KHARAFI &
SONS |
Rehabilitation of MAA North and South Piers: Installation of Loading Arms, Cathodic Protection and Miscellaneous Electrical Systems, Scaffolding, Sand Blasting & Painting. |
1999 |
2003 |
| Petrochemical Industries - PIC, Kuwait |
TECNIMONT S.P.A |
Construction works for upgrading capacity of Urea Granulation Plant |
1999 |
2003 |
| PNZ-Development Group, Joint Operations - Kuwait Oil Co.-Saudi Arabia Chevron Inc., Kuwait |
JO |
Reconstructions of Ratawi / Burgan Subcenters:
Construction Works for Upgrading the Existing various Subcenters with the New Facilities |
1999 |
2000 |
ISO-Octane Company Ltd., Dubai
UAE |
ISO OCTANE |
Construction of Gasoline Production Plant |
1999 |
2000 |
Emirates National Oil Company Limited, Jebel Ali,
UAE |
TECHNIP |
Erection of the Instrumentation Package for Condensate Processing Plant At Jebel Ali |
1998 |
1999 |
Joint Operations - Kuwait Gulf Oil Co.-Saudi Arabia Chevron Inc.,
Kuwait |
KOC |
Overhead Transmission Lines:
Design, Supply and Install 16 Km, 3 Phase, 13.8 Kv, 60 Hz. with Wooden Poles, Complete with Testing and Commissioning |
1998 |
1999 |
Ministry of Electricity & Water -
Kuwait |
MEW |
Completion Works in Doha Power Station:
Check, Test & Commissioning of Pumps, Generators, Fire Fighting Systems, Modification of Panels with all Associated Instrument & Civil Works. |
1998 |
1999 |
| Kuwait Oil Company |
SNAMPROGETTI |
Construction of Central Sea Water Injection Plant, Pipeline and Transfer Lines |
1998 |
1999 |
| Kuwait Oil Company |
COSTAIN |
Construction of new Condensate Recovery Units (CRU) at Gathering Centrers (GC - 7, 8) and Replacement of CRU Unit at (GC - 21) |
1997 |
1998 |
| Kuwait National Petroleum Company - KNPC |
MITSUI ENGINEERING & SHIPBUILDING CO. |
Construction Works for Spent Acid Recovery Plant- Mina Al Ahmadi Refinery |
1997 |
1998 |
| Kuwait Oil Company |
COSTAIN |
Construction works for the Improvement to Vapour Dehydration Units at Gas Booster Stations |
1996 |
1998 |
| Kuwait Oil Company |
COSTAIN |
Improvement of Fire Fighting System at all Gathering Centers |
1996 |
1997 |
| Saudi Arabian Texaco - SAT, Saudi Arabia |
TEXACO |
Construction of New 36 inch diameter Shiploading Submarine Pipeline from Onshore Booster Pumping Station to Offshore Berth |
1996 |
1997 |
| EQUATE Petrochemicals, Kuwait |
FLUOR INTERNATIONAL |
Construction of Underground Piping, Offsite Piping & Dock Facilities |
1996 |
1997 |
| Saudi Arabian Texaco - SAT, Saudi Arabia |
SAT |
Overhead Transmission Lines:
Electrical Transmission Systems of 13.8 KV Transmission line of 6 Km |
1996 |
1997 |
| Saudi Arabian Texaco - SAT, Saudi Arabia |
SAT |
Construction of Heaters & Heat Exchangers at Main Gathering Center (MGC) at Wafra Oilfield |
1996 |
1997 |
| EQUATE Petrochemicals, Kuwait |
FOSTER WHEELER |
Construction of Underground Piping- Ethylene Glycol Project |
1996 |
1996 |
| EQUATE Petrochemicals, Kuwait |
FOSTER WHEELER |
Construction of Ethylene Glycol Plant |
1996 |
1997 |
| Kuwait Oil Company |
KOC |
Installation of Gate Scanners for Gathering Centers On Line Continuous Salt Monitor at various Gathering Centres |
1996 |
1996 |
| Joint Operations - Kuwait Oil Co. /Saudi Arabian Chevron Inc., Kuwait |
JO |
Construction of Subcenter Production Facilities for Eocene Redeployment Project |
1995 |
1996 |
Ministry of Electricity & Water
Kuwait |
POLIMEX |
Sabiya Power Station Fuel Oil & Water Storage Tanks
Design, Supply, Fabricate and Construction of (16 Nos.) Liquid Fuel and Water Storage Tanks |
1994 |
1997 |
Ministry of Electricity & Water
Kuwait |
ANSALDO |
Construction of Water Recarbonation Plant at Doha West and Azzour Power Generation and Water Plants |
1994 |
1996 |
| Kuwait National Petroleum Company - KNPC |
KNPC |
Heavy Fuel Oil Unit Revamp at Shuaiba Refinery |
1993 |
1994 |
| Kuwait Oil Company |
THE PRICHARD CORPORATION |
Construction Works at Crude Oil Center & Related Manifold |
1993 |
1994 |
| Kuwait National Petroleum Company - KNPC |
CEGELEC |
Modernization of old Refinery and Gas Plant- Mina Al Ahmadi Refinery |
1993 |
1996 |
| Kuwait Oil Company |
KOC |
Construction of (4" - 6" Dia) Flow Lines |
1992 |
1993 |
| Kuwait Oil Company |
BECHTEL |
Construction of (20" & 16") Dia Pipeline |
1992 |
1992 |
| Kuwait Oil Company |
KOC |
Demolition Of Tank Farm - "C" |
1991 |
1991 |
| Kuwait Oil Company |
KOC |
Construction of (30" Dia) Strategic Gas Pipeline |
1989 |
1991 |
Ministry of Electricity & Water
Kuwait |
MEW |
Construction of Gas Scrubber & Pressure Reducing Station at Doha Power Station |
1988 |
1989 |
| Kuwait Oil Company |
KOC |
Upgrading & Repair of Fuel Oil Shipping Line |
1987 |
1987 |